← Back to Home

Case Studies

Practical improvements with measurable business results.

Operational Efficiency

Transforming inventory management without disrupting operations

Result: Reduced inventory process from 3–4 days with shutdown to 1 day with no disruption, and ultimately eliminated full physical inventory.

The Problem

  • • Physical inventory performed 4 times per year
  • • Production and shipping shut down for 2 days
  • • 3–4 days required to complete counts and update systems
  • • Overtime required for about 10 employees
  • • Inventory accuracy issues despite high effort

The Solution

  • • Introduced barcode scanning technology
  • • Rebuilt inventory procedures and accounting methods
  • • Eliminated manual data entry through system imports
  • • Added validation and error-checking controls
  • • Improved warehouse and shipping workflows

The Outcome

  • • Inventory process reduced to 1 day with no production shutdown
  • • Required workforce reduced by 50%
  • • Inventory accuracy significantly improved
  • • Physical inventory reduced from 4 times per year to once per year
  • • Eventually replaced with continuous cycle counting

Operational Efficiency / Business Continuity

ERP migration from Dynamics NAV to SAP with near-zero operational disruption

Result: Completed full ERP migration in an extended weekend with no serious operational disruption.

The Challenge

  • • Migration from on-premises Dynamics NAV 2016 to a remote SAP environment
  • • Need to align U.S. warehouse and shipping operations with parent company systems
  • • Limited migration window with strict go-live timeline
  • • Risk of disruption to production, shipping, and order processing

The Approach

  • • Led U.S.-side project coordination with international IT team
  • • Defined and refined warehouse and shipping workflows for SAP compatibility
  • • Performed extensive testing using real data and edge-case scenarios
  • • Prepared and validated data migration from NAV to SAP
  • • Established secure VPN connectivity and firewall configuration

The Outcome

  • • Successful transition completed within a single weekend
  • • No major operational disruptions during or after migration
  • • Seamless integration with parent company systems
  • • Validated processes ensured continuity from day one

Cybersecurity / Business Continuity

Building a layered security program and business continuity from the ground up

Result: Transformed security from reactive to a layered, monitored, and resilient environment.

The Problem

  • • Minimal security beyond a basic firewall
  • • Successful phishing incidents with financial loss
  • • Shared high-privilege accounts and weak password practices
  • • No continuous monitoring or incident response capability
  • • No formal continuity protections for power, network, or internet outages

The Approach

  • • Implemented password management, stronger policies, and MFA
  • • Enforced least privilege and removed shared super-user access
  • • Deployed managed SOC and behavior-based endpoint protection
  • • Introduced awareness training, phishing simulations, and dark-web monitoring
  • • Added UPS runtime, high-availability firewall, and failover internet

The Outcome

  • • Layered, standards-based security program
  • • Reduced successful phishing and user-driven risk
  • • Improved monitoring and response capability
  • • Stronger identity controls and reduced attack surface
  • • Business continuity for power and network disruptions

Dedicated to your success

Let’s start a conversation

Discuss your business, current challenges, and where experienced technology leadership can create the greatest value.

These choices apply to this browser. You can change them at any time.